Published: 22 June 2015
Disconnection of free standing electric oven from the mains, and the creation of two kitchen appliance power points. This needs to be done prior to 8.30am Monday 29 June.
#1 | Tradie 1 | No recent reviews | 34 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 2 jobs | No longer in contact |
#3 | Tradie 3 |
|
359 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 13 jobs | No longer in contact |
#5 | Tradie 5 | No recent reviews | 52 jobs | No longer in contact |
#6 | Tradie 6 |
|
150 jobs | No longer in contact |
Partner with Builderscrack
Get work