Published: 8 March 2016
I have garage being re-gibbed and I need an electrician to take care of electrical work. I have done cable work for the new power points and lighting. I need an electrician to sight the cable work before the wall lining is installed. 3-4 weeks later to come back, install power points, lights, switches, liven the new circuits and certify. All accessories provided. Hourly rate work is preferred, must be reliable.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Very pleased with the work and the standard. Thank you.
Work carried out by the owner/operator
Reviewed on 05-04-2016
Tradesperson reply
"Thanks for the work, a pleasure working for you.
Hope to see you in the future.
Iain"
Partner with Builderscrack
Get work