Published: 26 November 2015
Need to replace old switchboard with a new one. Before the old switchboard can be replaced some components (main fuse & relay fuse) will need to be moved to the metering board. To do this the electrician would need to liaise with lines contractors to connect/disconnect power (my expense). The switchboard can be replaced at the same time while the power is disconnected. Brand new flush 45-way PDL switchboard with all the necessary components is already available. Want it to get done before Xmas. Seeking quotes now please.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Reliable, professional and good communication. The switchboard upgrade involved liaising with power lines contractors, inspector and retailer. Completed within a day as planned.
Work carried out by the owner/operator
Reviewed on 03-12-2015
#1 | Tradie 1 | No recent reviews | 8 jobs | Secured job |
#2 | Tradie 2 | No recent reviews | 13 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 25 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 0 jobs | No longer in contact |
Partner with Builderscrack
Get work