Published on 6 January 2011
Hi there, 1) I have a new heat lamp/extractor/light which I have fitted in the ceiling which needs wiring up (I've already done the exhaust ducting) There is already existing wiring for old fan and light. I also have a heated towel rail which needs installing and wiring. 2) The bathroom has been retiled but the non tiled area needs preparing and repainting (approx 8 sq m) 3) Repaint of hallway (approx 20 sq m) 4) Installation of an angled bench top across a 2 metre gap - approx 1 metre wide at left side reducing to approx 60cms # 1 is a definite and depending on quotes for 2/3/4 will make a decision once received. Would like to get finished by the 14th Jan if possible. Cheers Andy
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Very impressed with Steve. From a timely and competitive quote to a super quick turnaround (which we needed) Job was done to a very high standard and he tidied up the bathroom/hall area before he left. Thanks again.
Work carried out by the owner/operator
Reviewed on 15 January 2011
Tradesperson reply
"I only did part of the job which came to $1250 they are going to do the rest at a later date"
Partner with Builderscrack
Get work