Review

Bathroom electrics/paint Hallway bench top.

Job description

General Electrical
Waitakere

Published: 6 January 2011

Hi there, 1) I have a new heat lamp/extractor/light which I have fitted in the ceiling which needs wiring up (I've already done the exhaust ducting) There is already existing wiring for old fan and light. I also have a heated towel rail which needs installing and wiring. 2) The bathroom has been retiled but the non tiled area needs preparing and repainting (approx 8 sq m) 3) Repaint of hallway (approx 20 sq m) 4) Installation of an angled bench top across a 2 metre gap - approx 1 metre wide at left side reducing to approx 60cms # 1 is a definite and depending on quotes for 2/3/4 will make a decision once received. Would like to get finished by the 14th Jan if possible. Cheers Andy


Review

Workmanship
5.0
Cost
5.0
Schedule
5.0
Communications
5.0

Very impressed with Steve. From a timely and competitive quote to a super quick turnaround (which we needed) Job was done to a very high standard and he tidied up the bathroom/hall area before he left. Thanks again.

Work carried out by the owner/operator
Reviewed on 15-01-2011

Tradesperson reply
"I only did part of the job which came to $1250 they are going to do the rest at a later date"

Verified Builderscrack review

Trade professionals

#1 Tradie 1 No recent reviews 8 jobs Secured job
#2 Tradie 2 No recent reviews 3 jobs No longer in contact
#3 Tradie 3 No recent reviews 14 jobs No longer in contact
#4 Tradie 4 No recent reviews 9 jobs No longer in contact
#5 Tradie 5 No recent reviews 2 jobs No longer in contact
#6 Tradie 6 No recent reviews 13 jobs No longer in contact
#7 Tradie 7 No recent reviews 46 jobs No longer in contact
#8 Tradie 8 No recent reviews 19 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo