Published on 29 October 2010
remove all walls and replace with new seratone. replace old shower with new shower with mixer attached to wall, new bath taps, new vanity unit with doors and drawers, 2 roller doors on bath, extractor fan installed. We are on low pressure water so will need to take this into account. If possible, would prefer someone who can do all jobs if possible.
Partner with Builderscrack
Get work