Published on 15 September 2013
Renovating and require some moving of light switches, new lights, and installation of heated towel rail. fuse in fusebox needs replacing plus other work. Likely to be staged in two processes.
Workmanship |
5.0
|
Cost |
4.0
|
Schedule |
4.0
|
Communications |
5.0
|
Brian was great at the job and we chose well. Thanks.
Work carried out by the owner/operator
Reviewed on 28 July 2014
Partner with Builderscrack
Get work