Published on 23 February 2025
Heya, After a Certified Electrician to finish my installation of 3x DC Ceiling Fans and 1x Outdoor Powerpoint. All cables are sitting in the roof cavity. Wanting to connect the 3 fans to a junction box then return to the main switchboard (space available). I have a J box and some wiring for the job. For the outdoor powerpoint, can be connected to any circuit that seems fitting.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Work carried out by the owner/operator
Reviewed on 24 February 2025
Partner with Builderscrack
Get work