Published: 29 June 2022
Replace 1970's switch panel with modern switchboard. Run new cable from switchboard outside and connect to new pool heat pump. Install grid-tied inverter ready for soon to be installed solar panels. 1 x new power socket. 1 x external light.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Work carried out by the owner/operator
Reviewed on 26-08-2022
#1 | Tradie 1 |
|
140 jobs | Secured job |
#2 | Tradie 2 |
|
33 jobs | No longer in contact |
#3 | Tradie 3 | Not reviewed | 2 jobs | No longer in contact |
#4 | Tradie 4 |
|
261 jobs | No longer in contact |
#5 | Tradie 5 |
|
4 jobs | No longer in contact |
#6 | Tradie 6 |
|
71 jobs | No longer in contact |
#7 | Tradie 7 |
|
65 jobs | No longer in contact |
#8 | Tradie 8 |
|
22 jobs | No longer in contact |
Partner with Builderscrack
Get work