Published: 17 April 2022
Installation and wiring in of 2 new horizontal double plug and 2 single plug power points for new mini flatpack kitchen in sleepout. House is not fully occupied so time of install needs to be negotiated with owner, but this is quite flexi over next two weeks. I have a photograph showing where wiring is in the wall behind the kitchen to make location of wires faster. Power switchboard immediately adjacent. Power points have not been purchased.
#1 | Tradie 1 |
|
21 jobs | No longer in contact |
#2 | Tradie 2 |
|
18 jobs | No longer in contact |
#3 | Tradie 3 |
|
71 jobs | No longer in contact |
#4 | Tradie 4 |
|
261 jobs | No longer in contact |
#5 | Tradie 5 |
|
122 jobs | No longer in contact |
#6 | Tradie 6 |
|
31 jobs | No longer in contact |
#7 | Tradie 7 |
|
63 jobs | No longer in contact |
#8 | Tradie 8 |
|
10 jobs | No longer in contact |
Partner with Builderscrack
Get work