Review

New Outdoor Point for Infinity

Job image
Job image

Job description

General Electrical
Kapiti Coast

We are needing to get a new outdoor PowerPoint installed ready for an infinity unit going in within 2 weeks, located just off the old SH in paraparaumu. A nice simple job. * Spare ways are available in the switchboard. * Wiring accessible through the ceiling access, good size loft, no belly crawling required. Drop down in grey conduit, surface mount. * Single Story - no scaffold required * Approx. 6-8m of distance (rise and run included) from where the switchboard to where the point would be located. *Looking to get this done asap.


Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo