Published on 26 July 2020
Two jobs actually. 1) Rectify the main switchboard. An RCD was installed last year but due to limited space the cover can not be fully closed. So I am looking for either finding a way to close it or upgrading the switchboard. 2) New power socket. I recently replaced the old electric cooktop with a gas cooktop, but surprisingly there is no power socket to connect the gas cooktop (the old cooktop was wired up). There is already cable in place, just need to put a socket (or make it like an extension cord)
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Naleen is very professional and well knowledgeable about safety & regulations. I am very satisfied with the work.
Work carried out by the owner/operator
Reviewed on 18 September 2020
Tradesperson reply
"Hi Jamie was nice meeting you too. Thanks allot will see you again.. 😊"
Partner with Builderscrack
Get work