Published on 2 December 2024
I need a TBS on a post - post and wiring already in place - just needs the switchboard and connecting, with a 16A Reyrolle and power point. Also need to have some new wiring in a closed in deck connected along with a new circuit breaker... and some powerpoints etc. Wiring already in place.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Great work. Thoroughly nice guys, professional, top communication, excellent work. Thanks guys.
Work carried out by the owner/operator
Reviewed on 31 March 2025
Partner with Builderscrack
Get work