Review

16A Reyrolle plus TBS

Job description

Electrical Renovations & Rewiring
Horsham Downs, Hamilton

Published on 2 December 2024

I need a TBS on a post - post and wiring already in place - just needs the switchboard and connecting, with a 16A Reyrolle and power point. Also need to have some new wiring in a closed in deck connected along with a new circuit breaker... and some powerpoints etc. Wiring already in place.


Review

Workmanship
5.0
Cost
5.0
Schedule
5.0
Communications
5.0

Great work. Thoroughly nice guys, professional, top communication, excellent work. Thanks guys.

Work carried out by the owner/operator
Reviewed on 31 March 2025

Verified Builderscrack review

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo