Review

16A Reyrolle plus TBS

Job description

Electrical Renovations & Rewiring Horsham Downs, Hamilton

Published on 2nd December 2024

I need a TBS on a post - post and wiring already in place - just needs the switchboard and connecting, with a 16A Reyrolle and power point. Also need to have some new wiring in a closed in deck connected along with a new circuit breaker... and some powerpoints etc. Wiring already in place.


Verified work review

Workmanship
5.0
Cost
5.0
Schedule
5.0
Communications
5.0

"Great work. Thoroughly nice guys, professional, top communication, excellent work. Thanks guys."

Work carried out by the owner/operator

Review posted by Paul on 31st March 2025

Verified Builderscrack review

Get connected now with NZ’s largest trade professional network

Get started