Review

New Kitchen

Job image
Job image

Job description

Electrical Renovations
Auckland

Published: 21 August 2015

We are renovating our kitchen. The job entails: 1) Disconnecting the Oven and Range hood 2) Adding a new powerpoint for a coffee machine 3) Adding two points at one location for the dishwasher and insinkerator 4) Moving a power point within 1m for the fridge. 5) Replacing 3 single points for 3 double points in the same position. 6) Replacing 3 light fittings 240 v for 240v 7) A return visit to connect up the new oven, hob and range hood.after kitchen installation. The main work is to be completed on either, 25th, 28th Aug or 1st or 4th of September as the new kitchen is arriving on the 8th of September. Appliance connection could be late in the day on the 8th or on Friday the 11th. The old kitchen has already been removed, walls are plasterboard so access is easy. Swtich board is old but has had an RCD added during previous rennovations. Plans are attached, blue squares indicate existing connections, and green indicate new locations. For the low connections there is 150 mm clearance beneath the cabinets so conduits could be used.


Review

Workmanship
5.0
Cost
5.0
Schedule
5.0
Communications
5.0

Work carried out by the owner/operator
Reviewed on 18-09-2015

Verified Builderscrack review

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo