Run 3 phase power cable from main switchboard (which is already fitted with 3 phase power), sort out new circuit breakers to fit in cabinet (will need some re-jigging of space as switchboard already fairly full) and run single phase 15 amp supply along with the new 3 phase circuit. Suspended ceiling, cables to run 1 metre behind gib, then 10 metres inside suspended ceiling cavity, then surface mount down outside of gib wall, 2 metres down, with capping covering the cables. Supply and fit 5 pin 3 phase outlet and 15 amp single phase outlet side by side.