Published: 19 September 2023
The pump switch needs to be accessible, so will require a hole drilled through the vanity side wall and gib. Also, need to have the two other switches mounted, for the heated towel rail and the light switch. Looks like the screws are m3 50mm. It would be great to get this done ASAP, within the next two days to finish up the final work in the bathroom.
#1 | Tradie 1 |
|
30 jobs | No longer in contact |
#2 | Tradie 2 |
|
52 jobs | No longer in contact |
#3 | Tradie 3 |
|
6 jobs | No longer in contact |
#4 | Tradie 4 |
|
267 jobs | No longer in contact |
Partner with Builderscrack
Get work