Published: 5 September 2023
Install external socket to outside of existing house to connect new sleepout. Supply an electrical COC document. The sleepout comes with the power cord, so this is not required to be supplied. Prefabricated sleepout is being delivered to site on Tues 26 Sept and the work needs to be done any time between now and 27 Sept.
#1 | Tradie 1 |
|
56 jobs | No longer in contact |
#2 | Tradie 2 |
|
25 jobs | No longer in contact |
#3 | Tradie 3 |
|
0 jobs | No longer in contact |
#4 | Tradie 4 |
|
268 jobs | No longer in contact |
#5 | Tradie 5 |
|
148 jobs | No longer in contact |
Partner with Builderscrack
Get work