Published: 26 June 2023
Require overhead to underground power and telecom conversion to rear of property at 29Maungarei. Current connection is via 29A overhead and this needs to be run underground beside/under driveway to connect to 29B directly - Approx distance 50m down right of way. Application lodged with Vector to disconnect current overhead for 29B (only) and connect to new connection point at the property edge. See Images
#1 | Tradie 1 |
|
268 jobs | No longer in contact |
#2 | Tradie 2 |
|
10 jobs | No longer in contact |
#3 | Tradie 3 |
|
8 jobs | No longer in contact |
#4 | Tradie 4 |
|
267 jobs | No longer in contact |
#5 | Tradie 5 |
|
21 jobs | No longer in contact |
#6 | Tradie 6 | No recent reviews | 12 jobs | No longer in contact |
#7 | Tradie 7 |
|
61 jobs | No longer in contact |
Partner with Builderscrack
Get work