Active job

Phase 3 power

Job description

General Electrical
Auckland

Published: 17 February 2023

We have power to the box at the side of the road, and three phase switch board, but something has happened between the road/box and the main switch board, so we only have two phases/2.5 of power. Either a new cable will need to be laid, or the old one dug up I guess.


Trade professionals

#1 Tradie 1 Not reviewed 0 jobs No longer in contact
#2 Tradie 2 Not reviewed 0 jobs No longer in contact
#3 Tradie 3
27 jobs No longer in contact
#4 Tradie 4
2 jobs No longer in contact
#5 Tradie 5
30 jobs No longer in contact
#6 Tradie 6
168 jobs No longer in contact
#7 Tradie 7
56 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo