Published: 18 January 2023
This ceiling is currently 4.7m high, We are dropping the ceiling down to 3m height. There will be a scissor lift on site next week to demo the old ceiling. We will then require 14 cables on 2 different circuits to be dropped down ready for fit off once the partitions and new ceiling have been built. The lights will be 600 x 600mm led panel lights that insert into suspended ceiling frame. We also require 6 other lights, and approx 6 power outlets to be installed (which can be done after this task at a later date). Happy to have you quote whole job, or just for the 14 cables/ two circuits for now. Prefer to have someone to quote this job including fit off/ completion installation. We have a lot of ongoing electrical work. Must be available next Wednesday 25th for task as the scissor will be there.
#1 | Tradie 1 | Not reviewed | 0 jobs | No longer in contact |
#2 | Tradie 2 |
|
140 jobs | No longer in contact |
#3 | Tradie 3 |
|
168 jobs | No longer in contact |
#4 | Tradie 4 |
|
0 jobs | No longer in contact |
#5 | Tradie 5 |
|
5 jobs | No longer in contact |
#6 | Tradie 6 |
|
42 jobs | No longer in contact |
Partner with Builderscrack
Get work