Published: 6 January 2023
Electrical work, new wiring has been laid out in the bathroom and kitchen power points for lighting, this needs to be finished. A new circuit breaker needs to be installed in the main board for the stove.
#1 | Tradie 1 |
|
56 jobs | No longer in contact |
#2 | Tradie 2 |
|
21 jobs | No longer in contact |
#3 | Tradie 3 |
|
268 jobs | No longer in contact |
#4 | Tradie 4 |
|
42 jobs | No longer in contact |
#5 | Tradie 5 |
|
7 jobs | No longer in contact |
#6 | Tradie 6 |
|
30 jobs | No longer in contact |
Partner with Builderscrack
Get work