Published: 25 July 2022
Electrical work to connect: - Pool heat pump - Pool pump - Pool lights Involves running power from house approx 30 meters to back of the property to the new pool shed which contains the pump and the pool heat pump. Both are located next to each other. Hence 2 outdoor sockets are needed to support these. In addition, connect power to the pool lights with a switch installed to operate them. In addition, reinstate power which was cut to carport by excavation work. Power to carport is right next to the pool shed. Timeframe for work to be done: mid to late august 2022. You are welcome to come visit the site to quote.
#1 | Tradie 1 |
|
140 jobs | No longer in contact |
#2 | Tradie 2 |
|
90 jobs | No longer in contact |
#3 | Tradie 3 |
|
31 jobs | No longer in contact |
#4 | Tradie 4 |
|
37 jobs | No longer in contact |
#5 | Tradie 5 |
|
9 jobs | No longer in contact |
#6 | Tradie 6 |
|
71 jobs | No longer in contact |
#7 | Tradie 7 |
|
12 jobs | No longer in contact |
#8 | Tradie 8 |
|
168 jobs | No longer in contact |
Partner with Builderscrack
Get work