Active job

Underground cable fault - As per Vector

Job description

Underground cabling
Auckland

Published: 8 July 2022

Hi, Lost power overnight...heard a loud bang. Vector diagnosed it as an underground cable fault between the point of supply just outside the fence and our power meter. As additional info, the Vector technician said that he was able to get an electric arc at the point of supply even when the main switch at our power meter was turned off. Looking to get this sorted ASAP please.


Trade professionals

#1 Tradie 1
90 jobs No longer in contact
#2 Tradie 2
11 jobs No longer in contact
#3 Tradie 3
63 jobs No longer in contact
#4 Tradie 4
479 jobs No longer in contact
#5 Tradie 5
10 jobs No longer in contact
#6 Tradie 6
36 jobs No longer in contact
#7 Tradie 7
1 job No longer in contact
#8 Tradie 8 No recent reviews 6 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo