Closed job

Heat pump power point

Job description

Powerpoints
Auckland

Published: 23 March 2022

A 20A dedicated circuit from the fuse panel to the external wall where the heat pump will be installed. The fuse panel is full and I need hidden wiring on this two level townhouse. That would almost mean cutting up ceiling gib and threading the wires through the floor joist to get to the fuse panel. The job is to run the wire and not to patch the gib.


Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo