Published: 8 January 2022
Run Power from house to two end points on deck. Attached end point hardware Create new on/off point in house that controls deck end points Wiring is already laid Hardware is already purchased. Job is to: 1. Add power on/off switch inside house. 2. Connect existing house supply to switch. 3. Connect laid wiring to switch (requires creating new wiring path from outside to inside house). 4. Connect end point wiring to hardware. 5. Required testing/compliance documentation. Where the wiring needs to enter the house we also already have fibre cabling entering. Power points already installed adjacent to where the wiring is required to enter the house. Wooden panelling house. All areas easily accessible - no crawl or underfloor work expected. All external hardware IP54 or greater.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Very pleased to get this work done.
Work carried out by the owner/operator
Reviewed on 08-02-2022
Partner with Builderscrack
Get work