Published: 2 February 2014
Our 1940s ex-state 2/3 bedroom house needs rewiring. There are ~15 plugs, ~15 switches, and ~15 lights. The bathroom has already been rewired to an RCD. The fuseboard is the original ceramic circuit breakers with a smart meter, so the quote needs to include a new fuse board. Thanks
#1 | Tradie 1 | Not reviewed | 0 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 1 job | No longer in contact |
#3 | Tradie 3 |
|
267 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 91 jobs | No longer in contact |
#5 | Tradie 5 | No recent reviews | 7 jobs | No longer in contact |
#6 | Tradie 6 | No recent reviews | 11 jobs | No longer in contact |
#7 | Tradie 7 | No recent reviews | 0 jobs | No longer in contact |
#8 | Tradie 8 | No recent reviews | 0 jobs | No longer in contact |
Partner with Builderscrack
Get work