Published: 10 August 2020
Replacement of house switchboard, replace old board with flush mounted switchboard with double pole main switch, new MCB protection of all circuits and RCD protection for all power and lighting circuits. Inspection and certification must be included.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Work carried out by the owner/operator
Reviewed on 06-09-2020
#1 | Tradie 1 |
|
140 jobs | Secured job |
#2 | Tradie 2 |
|
61 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 119 jobs | No longer in contact |
#4 | Tradie 4 |
|
268 jobs | No longer in contact |
Partner with Builderscrack
Get work