Published: 27 July 2020
I need to reposition the power cable which feeds the house from the street in order to build a porch. The work will mean a shorter cable to the house but will need to be conduited to reconnect to the meter. The work is not urgent.
Workmanship |
5.0
|
Cost |
4.0
|
Schedule |
5.0
|
Communications |
5.0
|
Work carried out by the owner/operator
Reviewed on 31-08-2020
#1 | Tradie 1 |
|
140 jobs | Secured job |
#2 | Tradie 2 | No recent reviews | 5 jobs | No longer in contact |
#3 | Tradie 3 |
|
71 jobs | No longer in contact |
#4 | Tradie 4 |
|
22 jobs | No longer in contact |
Partner with Builderscrack
Get work