Published: 9 September 2019
New fibre installation at the end of September. required to bring the connection into the house after Chorus have completed their work.
#1 | Tradie 1 |
|
50 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 5 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 0 jobs | No longer in contact |
#4 | Tradie 4 |
|
19 jobs | No longer in contact |
Partner with Builderscrack
Get work