Published: 29 July 2019
Require the following: 1. Recessed switchboard (with smart meter). 2. Move switchboard location 3 metres 3. Replace 4 circuits. One is a lighting circuit. Another is a power socket. 4. Install new earth. 5. Install 2 powersockets.
#1 | Tradie 1 |
|
267 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 41 jobs | No longer in contact |
#3 | Tradie 3 |
|
148 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 0 jobs | No longer in contact |
#5 | Tradie 5 |
|
191 jobs | No longer in contact |
#6 | Tradie 6 | No recent reviews | 52 jobs | No longer in contact |
Partner with Builderscrack
Get work