Published: 11 June 2019
To carry out the total load check (install a data recorder in the mains incomer in our switchboard). You need to check your mains cable size for additional load Separate Mains feed from metering to distribution to each unit x 2 Get Inspection for sub meter (new to be Installed) Certify.