Review

Move power point

Job description

General Electrical
Auckland

Published: 4 June 2013

I have replaced an existing wall oven. The power point needs to be moved a matter of inches only to accommodate the shape of the new oven.


Review

Workmanship
4.0
Cost
5.0
Schedule
3.0
Communications
4.0

Work carried out by an employee of the company
Reviewed on 18-08-2013

Verified Builderscrack review

Trade professionals

#1 Tradie 1
161 jobs Secured job
#2 Tradie 2
148 jobs No longer in contact
#3 Tradie 3 No recent reviews 2 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo