Active job

wire in some lights

Job description

General Electrical
Auckland

Published: 26 May 2013

I need to replace one central light with two pendants in my lounge and replace another light in my dining room. I pretty much need this done in two visits: One to remove current lighting, so my plasterer can skim coat, then after he has done this connect the new lights. If you can also remove the front of my heat pump so he can skim around this, that would also be great.


Trade professionals

#1 Tradie 1
148 jobs No longer in contact
#2 Tradie 2
161 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo