Review

Power to shed.

Job description

General Electrical
Auckland

Published: 5 February 2013

Looking for a quote to run a power cable from the switchboard in the house to a shed. The shed is 8m meters from the house. Maybe another 10m to the switchboard. The shed has a solar array and grid-tied inverter so the cable would be sized accordingly to reduce loss. Would require a small switchboard in shed to accommodate breakers for the solar array (maybe a second array) and double power socket. I could dig trench as required to save time and money. Code of Compliance would be required.


Review

Workmanship
5.0
Cost
5.0
Schedule
5.0
Communications
5.0

David did an excellent job. He went the extra mile to get things completed. I would recommend him.

Work carried out by the owner/operator
Reviewed on 12-03-2013

Verified Builderscrack review

Trade professionals

#1 Tradie 1 No recent reviews 12 jobs No longer in contact
#2 Tradie 2 No recent reviews 25 jobs No longer in contact
#3 Tradie 3
344 jobs No longer in contact
#4 Tradie 4
148 jobs No longer in contact
#5 Tradie 5 No recent reviews 16 jobs No longer in contact
#6 Tradie 6
161 jobs No longer in contact
#7 Tradie 7 No recent reviews 0 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo