Published: 27 August 2018
Require the removal of "shaver" points in two bathrooms and the installation of normal electrical points. Also whilst there, would be good to get a couple of USB plugs added to existing electrical power points.
#1 | Tradie 1 |
|
267 jobs | No longer in contact |
#2 | Tradie 2 |
|
103 jobs | No longer in contact |
#3 | Tradie 3 |
|
191 jobs | No longer in contact |
Partner with Builderscrack
Get work