Published: 5 December 2012
Replace above-mirror light unit in bathroom, remove Fluorescent light in sleep-out, put in a couple of metres of conduited cable to 2 new wall-mounted lights (one each end of the sleepout). You'll need to drill a hole in the lamp fitting to hook up the wiring.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Fab.. Thanks..
Work carried out by the owner/operator
Reviewed on 12-12-2012
#1 | Tradie 1 | No recent reviews | 42 jobs | Secured job |
#2 | Tradie 2 |
|
344 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 20 jobs | No longer in contact |
#4 | Tradie 4 |
|
161 jobs | No longer in contact |
#5 | Tradie 5 |
|
268 jobs | No longer in contact |
#6 | Tradie 6 | No recent reviews | 35 jobs | No longer in contact |
Partner with Builderscrack
Get work