Published: 12 April 2018
The power to the house is currently over the deck which is dangerous. I'd like to change the power cable to being underground instead of overhead. I know that the following needs to be done: Vector related work Cutting concrete, resetting the concrete once work is done. Digging Laying the pipes for the power cable Relocation of new power meter and installing the power meter in a different location in the house. The house is under renovations at the moment, so you should be able to work in conjunction with the builders. I would like a quote that includes all the tasks listed above.
Workmanship |
4.0
|
Cost |
4.0
|
Schedule |
4.0
|
Communications |
5.0
|
Great guy, easy to deal with and willing to go the extra mile. Would recommend.
Work carried out by the owner/operator
Reviewed on 30-07-2018
#1 | Tradie 1 | No recent reviews | 6 jobs | Secured job |
#2 | Tradie 2 |
|
168 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 0 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 18 jobs | No longer in contact |
#5 | Tradie 5 | No recent reviews | 18 jobs | No longer in contact |
Partner with Builderscrack
Get work