Published: 3 September 2012
- move switch board and meter from front bedroom w/robe and reposition in hallway cupboard - new switchboard/meter cabinet to be protected with circuit breakers/RCDs - Wire for sensor and porch light on new front door position with auto manual switch - Wire for new hallway light + two switch from other end of new hallway - wire and install 2 sockets either side of bed - install telephone on one side of bed - remove wall lights from new master brm and make safe - brm 2 install socket outlet - new light switch position as per plan - center brm light - brm 3 install socket outlet as per plan - existing dining rm remove light switch as per plan - install tv arial - remove lights in existing living rm and move cabling in wall - install light in new living rm - new cabling for TV in new TV rm Building work starting end of July, will take approx 7 weeks, so you will be needed over this time.
#1 | Tradie 1 |
|
161 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 52 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 25 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 0 jobs | No longer in contact |
#5 | Tradie 5 |
|
344 jobs | No longer in contact |
#6 | Tradie 6 | No recent reviews | 0 jobs | No longer in contact |
#7 | Tradie 7 | No recent reviews | 25 jobs | No longer in contact |
#8 | Tradie 8 | No recent reviews | 13 jobs | No longer in contact |
Partner with Builderscrack
Get work