Published: 20 August 2017
We have overhead power running from the street to our house. The lines are attached to an old severely rusted steel pole. This power feeds 4 houses (including ours). We are on a cross-lease. We are going to go underground. Have received a quote of work from vector/north power I require an electrician to lay and connect the power from the new 3 fuse service pit to our meter box. Approx. 9 meters (shortest distance) I will dig and fill the trench to the desired requirements. I am gathering quotes/knowledge at the moment and would like to engage with someone for an onsite discussion initially.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Dean was great. Job done and no fuss. Would recommend his work to anyone and will use again.
Work carried out by the owner/operator
Reviewed on 14-11-2017
#1 | Tradie 1 | No recent reviews | 5 jobs | Secured job |
#2 | Tradie 2 | No recent reviews | 24 jobs | No longer in contact |
#3 | Tradie 3 |
|
168 jobs | No longer in contact |
#4 | Tradie 4 |
|
102 jobs | No longer in contact |
#5 | Tradie 5 | No recent reviews | 108 jobs | No longer in contact |
Partner with Builderscrack
Get work