Published: 17 January 2017
Install new power outlet in exterior wall, the gib has been removed so fairly straight forward. The only catch is that we need someone to do the work either the 18th or 19th of January.
Workmanship |
4.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Work carried out by the owner/operator
Reviewed on 18-01-2017
Partner with Builderscrack
Get work