Published: 13 October 2011
Still scoping full extent of works but here is a rough outline. 1. Once framing is up, run wires and cut holes for power points. Probably around four or five new and existing ones. Re use switches if possible. 2. New light fittings (batten fixtures probably). 3. Reconnect stove to new location. 4. Reconnect telephone wires (still confirming, may not need this) 5. Come back after painting In terms of time frame, this would be in the first week of construction, so probably after 20th October. EDIT: Also forgot to mention, would like a rangehood installed in the kitchen and a 3-in-1 installed in the bathroom as well.
#1 | Tradie 1 | No recent reviews | 52 jobs | Secured job |
#2 | Tradie 2 | No recent reviews | 46 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 3 jobs | No longer in contact |
#4 | Tradie 4 |
|
148 jobs | No longer in contact |
#5 | Tradie 5 | No recent reviews | 35 jobs | No longer in contact |
#6 | Tradie 6 | No recent reviews | 14 jobs | No longer in contact |
#7 | Tradie 7 | No recent reviews | 25 jobs | No longer in contact |
Partner with Builderscrack
Get work