Published: 8 July 2016
To dig a trench 200mm deep and lay 20mm green pipe from the road to the house for fibre optic cable. House is on a right of way. The job will involve removing and relaying of brick paving. Installing Cat6 cable and connection points inside the house.
#1 | Tradie 1 | No recent reviews | 2 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 41 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 18 jobs | No longer in contact |
Partner with Builderscrack
Get work