Active job

Demolition - Deck and lean-to

Job image
Job image
Job image

Job description

General Demolition
Wellington

Published: 22 March 2024

We are doing some renovations on our house and before that starts we would like to demolish our deck and lean-to. We will have the gas, electricity and water in the lean-to cut off. We are on a time crunch so the sooner the better. Our preference is demolition and removal but can sort removal at a later date if not possible.


Trade professionals

#1 Tradie 1
2 jobs In contact
#2 Tradie 2
27 jobs No longer in contact
#3 Tradie 3
11 jobs No longer in contact
#4 Tradie 4
7 jobs No longer in contact
#5 Tradie 5
27 jobs No longer in contact
#6 Tradie 6
17 jobs No longer in contact
#7 Tradie 7
7 jobs No longer in contact
#8 Tradie 8
23 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo