We are doing some renovations on our house and before that starts we would like to demolish our deck and lean-to. We will have the gas, electricity and water in the lean-to cut off. We are on a time crunch so the sooner the better. Our preference is demolition and removal but can sort removal at a later date if not possible.
#1 | Tradie 1 |
|
2 jobs | In contact |
#2 | Tradie 2 |
|
26 jobs | No longer in contact |
#3 | Tradie 3 |
|
11 jobs | No longer in contact |
#4 | Tradie 4 |
|
7 jobs | No longer in contact |
#5 | Tradie 5 |
|
27 jobs | No longer in contact |
#6 | Tradie 6 |
|
17 jobs | No longer in contact |
#7 | Tradie 7 |
|
5 jobs | No longer in contact |
#8 | Tradie 8 |
|
23 jobs | No longer in contact |
Partner with Builderscrack
Get work