Published: 14 May 2016
Two story house with external chimney. Want quotes to remove the chimney for three different.options please. (1) Remove chimney down to roof eaves level. Seal, make good roof (Colour Steel) and eaves. Remove bricks & rubble. (2) Remove Chimney down to top of first floor. Seal, make good roof, Eaves and wooden weatherboards. Remove bricks & rubble. (3) Remove chimney down to ground level. Seal, make good roof, Eaves and wooden weatherboards. Remove bricks & rubble. No resurfacing on the ground floor as I will want to get a double door fitted first. Note: Internal Fireplace has already been removed and wall gibbed. 12 steps up from driveway to bricked side of house. Side of house is a small sloping angle (ie not dead flat).
#1 | Tradie 1 |
|
374 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 20 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 18 jobs | No longer in contact |
Partner with Builderscrack
Get work