Published: 24 October 2022
Remove 6.5 m2 of sand and clay with the dingo and take to dump; Box up any areas that need clean line of boxing; Install steel mesh in entire driveway to add strength; Supply and lay plain or aggregate concrete ( would like cost for each ); driveway area 11cm thick; over steel mesh roughtly total 115m2 sq metres; Stress cuts concrete after 2 days of pouring to avoid cracking
#1 | Tradie 1 |
|
11 jobs | No longer in contact |
#2 | Tradie 2 |
|
14 jobs | No longer in contact |
#3 | Tradie 3 |
|
11 jobs | No longer in contact |
#4 | Tradie 4 |
|
5 jobs | No longer in contact |
#5 | Tradie 5 |
|
1 job | No longer in contact |
#6 | Tradie 6 |
|
12 jobs | No longer in contact |
Partner with Builderscrack
Get work