Published: 6 September 2015
Need an 18m straight concrete foundation for a low height block retaining wall. We have the firth paver blocks and would like them plastered in place as well. Its a good time to dig for the foundation, as the earth has not hardened for summertime yet.
#1 | Tradie 1 | No recent reviews | 4 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 43 jobs | No longer in contact |
#3 | Tradie 3 |
|
90 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 8 jobs | No longer in contact |
#5 | Tradie 5 | No recent reviews | 2 jobs | No longer in contact |
Partner with Builderscrack
Get work