Published: 3 May 2010
I need an existing concrete drive cut and partially removed (approx 10 square metres). Then an additional drive laid up to the existing drive (also approx 10 square metres). The location is approximately 200m from the road and the beginning of the drive is very steep so I doubt a concrete truck could get down to pour on site. I imagine a concrete pump would be required to get the concrete down.
#1 | Tradie 1 | No recent reviews | 10 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 6 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 7 jobs | No longer in contact |