Published: 15 August 2012
We have 33m2 of pavers to be laid. This job will require some cutting. We have a bottom stair which needs removing before the pavers are put down in that area. Once the pavers are down we are wanting a seal to be put over the pavers.
Workmanship |
5.0
|
Cost |
4.0
|
Schedule |
5.0
|
Communications |
5.0
|
We were very happy with the job that was done. Alan left the job site clean and tidy. We highly recommend him.
Work carried out by the owner/operator
Reviewed on 26-09-2012
Partner with Builderscrack
Get work