Published: 15 January 2023
Currently last part of our driveway: 6.5 x 3m is stone chips. We want the area concreted. Job requires full dig out and preparation. Require someone to do the full job. Timeframe is as soon as possible.
#1 | Tradie 1 |
|
5 jobs | No longer in contact |
#2 | Tradie 2 |
|
7 jobs | No longer in contact |
#3 | Tradie 3 |
|
9 jobs | No longer in contact |
#4 | Tradie 4 |
|
12 jobs | No longer in contact |
#5 | Tradie 5 |
|
0 jobs | No longer in contact |
#6 | Tradie 6 | Not reviewed | 0 jobs | No longer in contact |
#7 | Tradie 7 | Not reviewed | 0 jobs | No longer in contact |
Partner with Builderscrack
Get work