Published: 28 June 2019
Replace existing concrete driveway, which is very rough and cracking.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
4.0
|
Communications |
5.0
|
Not his fault it took longer - there were two other businesses to co-ordinate - concrete and traffic management (the latter was the stumbling block)
Work carried out by the owner & subcontractors
Reviewed on 20-10-2019