Published on 8 February 2024
I'm lining a pottery studio in my back yard built in 1994. I'm going to lay Cork tiles. I'd like the concrete slab floor leveled before I do this. It's 20m2. Currently uncovered no flooring needs to be removed. Many thanks
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Highly recommend Gavin, he was very efficient, friendly and was willing to listen to me and get the service just right for my needs. Would definitely use him again
Work carried out by the owner/operator
Reviewed on 12 February 2024
Partner with Builderscrack
Get work